Solar panels in Jávea — turnkey installation

4.6★ · 116 Google reviews · 581 installations · since 2013 · 8 languages

Turnkey from 5300 € — a typical 6 kWp system in Jávea pays for itself in 3.8–5.3 years.

The price includes panels, inverter, mounting, installation, town-hall legalisation and the switch to a self-consumption contract. VAT included.

Our own crews, Tier-1 components, and we handle the paperwork end to end.

We measure your roof on satellite imagery and show your production, savings and price. No call needed.

Or start from your electricity bill
or
Ask us on WhatsApp

Jávea (Xàbia) receives 2,047 kWh/m² of sunshine every year — one of Europe's highest figures — and nearly half its residents are international. ENERA, your local Costa Blanca installer, is here to help.

2047

Solar irradiation · kWh/m²

1210 €1730 €

Avg savings / year

≈3.8–5.3 years

Typical payback

The average household in Comunitat Valenciana spends 920 €/yr on electricity (INE, 2025). That reflects local consumption — climate, dwelling size, appliance mix — not a different price per kWh.

Build custom system
Solar PVSolar water heater

5 installations in Javea · 15 kW

5 installations in Javea
Solar water heater · date unknown · A CorunaSolar water heater · May 2022 · LugoSolar water heater · Sep 2020 · CadizSolar water heater · Jun 2020 · CadizSolar water heater · Apr 2022 · CadizSolar water heater · Jul 2020 · El RonquilloSolar PV · Aug 2022 · Mieres6 kW · Oct 2023 · Estepona6 kW · Oct 2022 · Cremenes6 kW · Jun 2021 · Benahavís10 kW · Jun 2024 · Estepona4 kW · May 2026 · Estepona6 kW · Apr 2022 · Benahavís8 kW · Nov 2022 · Benahavís15 kW · Sep 2025 · MarbellaSolar PV · Aug 2022 · Marbella20 kW · Mar 2026 · MarbellaSolar PV · Apr 2022 · Marbella15 kW · May 2026 · MarbellaSolar water heater · Aug 2023 · Alora10 kW · May 2023 · Mijas10 kW · Aug 2023 · Alhaurin El GrandeSolar water heater · Feb 2022 · CamalenoSolar water heater · Dec 2021 · MalagaSolar water heater · Jun 2020 · Malaga6 kW · Nov 2022 · San Martin De Valdeiglesias5 kW · Jun 2023 · MaruganSolar water heater · Jun 2021 · Periana5 kW · 2024 · MarmolejoSolar water heater · Apr 2024 · SedellaSolar water heater · 2021 · Martos4 kW · Feb 2026 · MontefrioSolar water heater · Sep 2021 · NerjaSolar water heater · Jun 2020 · Illescas30 kW · Jun 2025 · Pozuelo De AlarconSolar water heater · Apr 2021 · AlmunecarSolar water heater · Oct 2020 · GranadaSolar water heater · Jul 2021 · GranadaSolar water heater · 2020 · Granada15 kW · Apr 2025 · Bareyo6 kW · Dec 2023 · MonachilSolar water heater · Jun 2022 · Monachil4 kW · Feb 2025 · Cenes De La Vega6 kW · Jul 2023 · Cenes De La VegaSolar water heater · Aug 2023 · LanjaronSolar water heater · Oct 2020 · LanjaronSolar water heater · Nov 2021 · CarataunasSolar PV · Sep 2020 · GuadalajaraSolar water heater · date unknown · AlmeriaSolar water heater · Oct 2023 · AlmeriaSolar water heater · Jul 2020 · AlboxSolar water heater · Oct 2020 · ZurgenaSolar water heater · 2020 · ZurgenaSolar water heater · Apr 2024 · LorcaSolar water heater · Jan 2022 · Lorca5 kW · Sep 2022 · PulpiSolar water heater · Feb 2021 · Calasparra5 kW · Feb 2025 · Lorca3 kW · Sep 2025 · Alhama De Murcia15 kW · Feb 2022 · Mazarrón8 kW · Feb 2025 · MazarrónSolar water heater · Nov 2020 · Mazarrón5 kW · Oct 2025 · Mazarrón3 kW · Jun 2025 · MazarrónSolar water heater · Nov 2020 · FortunaSolar water heater · Apr 2023 · MurciaSolar water heater · Mar 2021 · MurciaSolar water heater · Aug 2023 · MurciaSolar PV · Mar 2021 · Yecla3 kW · Aug 2024 · MurciaSolar water heater · Nov 2022 · MurciaSolar PV · Oct 2023 · MurciaSolar water heater · Oct 2023 · Murcia4 kW · May 2023 · Murcia5 kW · May 2023 · Murcia5 kW · Feb 2025 · PinosoSolar water heater · Jun 2024 · PinosoSolar water heater · Nov 2020 · Pinoso3 kW · Dec 2024 · PinosoSolar water heater · Jan 2023 · PinosoSolar water heater · Jan 2023 · PinosoSolar water heater · Jan 2021 · PinosoSolar water heater · May 2022 · Pinoso6 kW · Apr 2025 · AbanillaSolar water heater · Jun 2020 · Cartagena4 kW · Jul 2022 · Cartagena10 kW · Jan 2024 · PinosoSolar water heater · Apr 2024 · Orihuela10 kW · 2024 · Hondon De Los FrailesSolar water heater · Jun 2020 · OrihuelaSolar water heater · Sep 2020 · OrihuelaSolar PV · Jan 2023 · Orihuela3 kW · Feb 2025 · Hondon De Los FrailesSolar PV · Oct 2022 · OrihuelaSolar water heater · date unknown · Siete AguasSolar water heater · Apr 2021 · Orihuela2 kW · 2020 · OrihuelaSolar water heater · Sep 2024 · La RomanaSolar water heater · Feb 2026 · La RomanaSolar water heater · Apr 2024 · La Romana4 kW · 2021 · ZaragozaSolar water heater · Jan 2024 · Hondon De Las Nieves4 kW · May 2026 · Pilar De La Horadada6 kW · Apr 2025 · Hondon De Las Nieves4 kW · May 2026 · Pilar De La Horadada6 kW · Jun 2026 · Pilar De La Horadada3 kW · Jun 2026 · Pilar De La Horadada6 kW · Sep 2025 · Pilar De La HoradadaSolar water heater · Sep 2025 · La Romana4 kW · Feb 2026 · Pilar De La Horadada4 kW · Jul 2025 · Los Alcázares10 kW · Apr 2025 · Cartagena6 kW · Sep 2025 · Los Alcázares5 kW · May 2026 · JacarillaSolar water heater · Oct 2020 · MonoverSolar water heater · 2021 · San Miguel De SalinasSolar water heater · Apr 2026 · Catral6 kW · Jan 2022 · Orihuela Costa6 kW · Apr 2026 · Pilar De La HoradadaSolar water heater · Jun 2021 · Torrevieja5 kW · Mar 2025 · OrihuelaSolar water heater · May 2023 · CrevillentSolar water heater · Jul 2022 · SaxSolar water heater · Jan 2023 · San Pedro Del PinatarSolar water heater · Feb 2021 · San Miguel De SalinasSolar water heater · Oct 2023 · San Miguel De Salinas6 kW · Apr 2025 · CrevillentSolar PV · May 2021 · Orihuela4 kW · Oct 2022 · Orihuela CostaSolar water heater · Apr 2026 · Orihuela4 kW · Feb 2022 · Orihuela6 kW · Dec 2023 · OrihuelaSolar water heater · Jan 2025 · AspeSolar water heater · Nov 2020 · AspeSolar water heater · Aug 2022 · Pilar De La HoradadaSolar water heater · Feb 2024 · Orihuela Costa3 kW · Dec 2022 · OrihuelaSolar water heater · May 2025 · OrihuelaSolar water heater · 2020 · OrihuelaSolar water heater · Sep 2020 · Orihuela CostaSolar water heater · Jul 2021 · Casinos3 kW · Nov 2022 · Orihuela Costa4 kW · Sep 2025 · Orihuela Costa4 kW · Feb 2026 · Orihuela CostaSolar water heater · Jun 2022 · Orihuela4 kW · Dec 2021 · Orihuela Costa5 kW · Oct 2022 · Orihuela Costa23 kW · Sep 2025 · OrihuelaSolar water heater · 2021 · Orihuela CostaSolar water heater · 2020 · Orihuela CostaSolar water heater · Feb 2026 · Orihuela3 kW · Apr 2026 · Orihuela Costa4 kW · Sep 2022 · Algorfa6 kW · Mar 2025 · Orihuela3 kW · Jun 2026 · Torrevieja6 kW · Dec 2024 · Torrevieja6 kW · Apr 2022 · OrihuelaSolar water heater · Mar 2022 · Daya Vieja4 kW · May 2025 · Los Montesinos6 kW · Apr 2025 · Torrevieja6 kW · Aug 2021 · Orihuela5 kW · Dec 2024 · Benijofar5 kW · Jul 2022 · Orihuela Costa6 kW · Apr 2022 · Orihuela5 kW · Jan 2021 · Orihuela3 kW · Apr 2025 · Orihuela Costa4 kW · Apr 2023 · Rojales6 kW · Apr 2022 · Orihuela Costa10 kW · Feb 2022 · Torrevieja4 kW · Dec 2022 · RojalesSolar PV · Jan 2022 · Rojales4 kW · Jul 2023 · TorreviejaSolar water heater · Oct 2022 · TorreviejaSolar water heater · Apr 2022 · Torrevieja10 kW · Apr 2022 · Rojales4 kW · Jul 2025 · Rojales9 kW · Feb 2024 · Rojales8 kW · May 2025 · TorreviejaSolar water heater · Feb 2026 · Torrevieja6 kW · Jul 2022 · Torrevieja3 kW · Mar 2026 · RojalesSolar water heater · 2024 · San Fulgencio6 kW · Aug 2022 · RojalesSolar water heater · Jan 2021 · Torrevieja5 kW · Jan 2026 · Torrevieja3 kW · Oct 2024 · Torrevieja4 kW · May 2026 · RojalesSolar water heater · Sep 2020 · Rojales5 kW · Nov 2025 · TorreviejaSolar water heater · Dec 2020 · ElcheSolar water heater · Sep 2020 · Torrevieja6 kW · Mar 2022 · Rojales4 kW · Aug 2022 · TorreviejaSolar PV · 2021 · Torrevieja6 kW · Mar 2022 · RojalesSolar water heater · 2019 · Elche6 kW · Oct 2021 · Rojales4 kW · Jan 2023 · TorreviejaSolar water heater · Oct 2023 · Elche3 kW · Dec 2021 · TorreviejaSolar water heater · Mar 2021 · Alcublas5 kW · Sep 2025 · San Fulgencio8 kW · Oct 2022 · Guardamar del Segura5 kW · Jun 2026 · Torrevieja7 kW · Feb 2024 · TorreviejaSolar water heater · Aug 2021 · TorreviejaSolar water heater · Jul 2020 · Torrevieja10 kW · Dec 2023 · TorreviejaSolar water heater · Jul 2020 · TorreviejaSolar water heater · May 2024 · Torrevieja5 kW · 2020 · TorreviejaSolar water heater · 2019 · TorreviejaSolar water heater · Oct 2020 · Torrevieja5 kW · Feb 2023 · San FulgencioSolar water heater · Jul 2021 · Torrevieja3 kW · Aug 2024 · San Fulgencio3 kW · Dec 2024 · Torrevieja4 kW · Aug 2022 · Guardamar del Segura6 kW · Aug 2025 · Cheste5 kW · Dec 2024 · TorreviejaSolar water heater · Sep 2021 · Torrevieja4 kW · Jun 2026 · TorreviejaSolar water heater · Feb 2021 · Torrevieja8 kW · May 2023 · San Fulgencio6 kW · Dec 2023 · Torrevieja5 kW · Mar 2026 · TorreviejaSolar water heater · Jun 2020 · Castalla3 kW · Sep 2022 · Torrevieja3 kW · Oct 2022 · Torrevieja6 kW · Jul 2024 · Torrevieja6 kW · Oct 2022 · Torrevieja5 kW · Jun 2025 · Guardamar del Segura6 kW · Jan 2024 · Guardamar del Segura2 kW · Jan 2025 · Torrevieja6 kW · May 2025 · TorreviejaSolar water heater · 2019 · Torrevieja6 kW · Feb 2026 · TorreviejaSolar water heater · Jan 2024 · Torrevieja4 kW · Feb 2021 · Guardamar del SeguraSolar water heater · Jan 2023 · LliriaSolar water heater · Sep 2020 · Elche5 kW · Feb 2025 · Castalla6 kW · Jan 2023 · Godelleta6 kW · Aug 2022 · Montserrat6 kW · Jun 2021 · Montserrat4 kW · Jul 2026 · Turis3 kW · Sep 2025 · TibiSolar water heater · May 2022 · LliriaSolar water heater · Mar 2022 · Alicante4 kW · Apr 2026 · AlbericSolar water heater · Feb 2022 · Santa Pola5 kW · Jan 2022 · Santa PolaSolar water heater · May 2021 · Santa PolaSolar water heater · Aug 2020 · Santa Pola10 kW · Aug 2025 · Santa PolaSolar water heater · Nov 2022 · Agullent4 kW · Aug 2022 · Santa Pola4 kW · Mar 2023 · Mutxamel6 kW · Jun 2023 · ManisesSolar water heater · Dec 2023 · Santa PolaSolar water heater · May 2023 · AlicanteSolar water heater · May 2022 · Xativa6 kW · Jan 2025 · Xativa5 kW · Sep 2023 · Alicante10 kW · Mar 2026 · AlicanteSolar water heater · date unknown · AlicanteSolar water heater · May 2023 · AlicanteSolar PV · Aug 2021 · AlicanteSolar water heater · May 2021 · Alicante3 kW · Feb 2025 · Alicante6 kW · Jun 2024 · Alicante10 kW · Nov 2022 · Alicante4 kW · Sep 2024 · XixonaSolar water heater · Dec 2021 · Alicante6 kW · Apr 2022 · PaternaSolar water heater · Apr 2024 · AlcoiSolar water heater · Sep 2023 · Alicante5 kW · Jun 2025 · AlicanteSolar water heater · Mar 2025 · Alicante10 kW · Jan 2023 · Mutxamel10 kW · Feb 2025 · Godella3 kW · Aug 2023 · MutxamelSolar water heater · Jul 2021 · Alzira3 kW · Aug 2023 · Mutxamel6 kW · Jan 2024 · Sant Joan Dalacant6 kW · Jul 2022 · MutxamelSolar water heater · Feb 2021 · Alicante3 kW · Sep 2023 · Mutxamel7 kW · Nov 2025 · Alicante3 kW · Nov 2025 · Busot3 kW · Aug 2023 · MutxamelSolar water heater · Aug 2023 · Mutxamel5 kW · Nov 2021 · Alicante5 kW · Jan 2025 · Busot4 kW · Sep 2024 · Busot6 kW · Oct 2025 · MutxamelSolar water heater · 2021 · Albal4 kW · Dec 2023 · Busot6 kW · Mar 2024 · AlicanteSolar water heater · May 2022 · El CampelloSolar water heater · Aug 2022 · GodellaSolar water heater · Aug 2022 · El CampelloSolar water heater · May 2021 · El CampelloSolar PV · Jan 2021 · El CampelloSolar PV · Jan 2021 · El CampelloSolar water heater · Nov 2022 · El CampelloSolar water heater · Oct 2020 · El CampelloSolar water heater · Oct 2020 · MillenaSolar water heater · Oct 2020 · El CampelloSolar PV · Jan 2023 · Alzira3 kW · Mar 2026 · ValenciaSolar water heater · Nov 2021 · El Campello5 kW · Sep 2023 · ValenciaSolar water heater · Jun 2020 · ValenciaSolar water heater · Dec 2020 · Valencia5 kW · Jan 2023 · AlziraSolar water heater · Feb 2021 · AlboraiaSolar water heater · Sep 2020 · AlmudainaSolar water heater · Jan 2021 · Relleu10 kW · Jun 2026 · Relleu3 kW · Apr 2025 · Rafelbunyol5 kW · Dec 2024 · SuecaSolar water heater · Jan 2022 · Relleu10 kW · Jul 2022 · El Campello4 kW · Sep 2021 · El Campello6 kW · Jun 2025 · Sueca5 kW · Sep 2025 · SuecaSolar water heater · Jan 2021 · Relleu6 kW · May 2026 · La Vila Joiosa5 kW · Mar 2025 · Llocnou De Sant Jeroni2 kW · Jul 2024 · SaguntoSolar water heater · Mar 2025 · Orxeta5 kW · Jan 2026 · Orxeta14 kW · Jun 2025 · La Vila JoiosaSolar water heater · Aug 2021 · CulleraSolar water heater · 2019 · OrxetaSolar water heater · Apr 2026 · Cullera6 kW · Oct 2024 · GandiaSolar PV · Jun 2022 · Finestrat3 kW · Nov 2024 · Finestrat6 kW · Dec 2025 · FinestratSolar water heater · Nov 2022 · FinestratSolar water heater · date unknown · Finestrat6 kW · Jul 2025 · AlteaSolar water heater · Feb 2022 · Finestrat3 kW · Jul 2024 · Finestrat6 kW · Oct 2023 · FinestratSolar water heater · Dec 2024 · Finestrat6 kW · May 2024 · Finestrat5 kW · Jul 2022 · FinestratSolar water heater · Dec 2022 · FinestratSolar water heater · Oct 2020 · El Castell De GuadalestSolar water heater · May 2024 · Finestrat6 kW · Mar 2021 · Finestrat6 kW · Aug 2025 · Finestrat4 kW · Aug 2022 · Finestrat6 kW · Sep 2022 · Finestrat3 kW · Oct 2023 · Finestrat4 kW · Jul 2021 · SaguntoSolar water heater · Jun 2024 · Finestrat6 kW · Oct 2022 · Finestrat3 kW · Jan 2023 · Finestrat6 kW · Oct 2023 · Finestrat5 kW · Apr 2022 · Finestrat6 kW · Aug 2025 · Finestrat4 kW · Nov 2020 · FinestratSolar water heater · Sep 2025 · Finestrat6 kW · Jul 2022 · Finestrat10 kW · Jan 2023 · Finestrat6 kW · Feb 2022 · Finestrat6 kW · Jun 2026 · FinestratSolar water heater · Jan 2021 · Finestrat6 kW · Jan 2023 · Finestrat4 kW · Jan 2026 · Finestrat8 kW · Jan 2023 · Finestrat6 kW · Aug 2023 · Finestrat3 kW · Aug 2025 · Finestrat6 kW · Nov 2022 · Finestrat5 kW · Nov 2022 · FinestratSolar water heater · May 2022 · Gandia10 kW · Dec 2022 · Finestrat6 kW · Jun 2022 · Finestrat6 kW · May 2025 · FinestratSolar water heater · Nov 2021 · Finestrat6 kW · Feb 2025 · FinestratSolar water heater · Feb 2022 · El Castell De GuadalestSolar water heater · Feb 2021 · Callosa Den Sarria6 kW · May 2023 · Polop3 kW · Jul 2022 · Polop5 kW · Feb 2024 · BenidormSolar water heater · Feb 2024 · Polop5 kW · Jun 2022 · Polop6 kW · Jan 2023 · BenidormSolar water heater · Aug 2023 · Daimus5 kW · Jul 2026 · Polop6 kW · Oct 2022 · Polop4 kW · Sep 2025 · PolopSolar water heater · Dec 2023 · Benidorm3 kW · Apr 2025 · PolopSolar water heater · Jul 2022 · BenidormSolar water heater · 2021 · La NucíaSolar water heater · Jul 2021 · La NucíaSolar water heater · Oct 2024 · La NucíaSolar water heater · Jun 2020 · La NucíaSolar PV · Apr 2021 · OlivaSolar water heater · Sep 2020 · OlivaSolar water heater · Jun 2021 · OlivaSolar water heater · Jul 2020 · La Nucía6 kW · Sep 2021 · Lalfas Del PiSolar water heater · Oct 2021 · La NucíaSolar water heater · Aug 2022 · OlivaSolar water heater · Sep 2023 · Finestrat10 kW · Sep 2021 · Lalfas Del PiSolar water heater · 2019 · AlteaSolar water heater · Aug 2021 · Lalfas Del PiSolar water heater · Sep 2020 · Lalfas Del Pi10 kW · Sep 2021 · Benidorm4 kW · Apr 2026 · La Nucía10 kW · Apr 2026 · Lalfas Del Pi10 kW · Oct 2025 · Lalfas Del Pi6 kW · Nov 2023 · Lalfas Del PiSolar water heater · Oct 2021 · Lalfas Del Pi8 kW · Sep 2024 · Murla10 kW · Jun 2022 · La Nucía10 kW · Dec 2023 · AlteaSolar PV · Oct 2023 · Lalfas Del Pi10 kW · Feb 2026 · Lalfas Del PiSolar water heater · Aug 2022 · Altea6 kW · Jan 2023 · AlteaSolar PV · Jan 2024 · AlteaSolar water heater · Jun 2024 · Lalfas Del Pi8 kW · May 2025 · AlteaSolar water heater · Aug 2021 · Altea5 kW · May 2026 · Altea10 kW · May 2021 · Oliva4 kW · Sep 2023 · Lalfas Del PiSolar water heater · Jan 2023 · AlteaSolar water heater · May 2021 · AlteaSolar water heater · Jun 2021 · AlteaSolar water heater · Dec 2023 · Dénia6 kW · Aug 2021 · Altea5 kW · Jan 2025 · OlivaSolar water heater · Oct 2021 · Benimeli5 kW · Mar 2021 · Lalfas Del Pi4 kW · Jan 2025 · OlivaSolar water heater · Jul 2020 · Alcalali7 kW · Sep 2022 · AlteaSolar water heater · May 2023 · Altea6 kW · Dec 2023 · Altea10 kW · Aug 2024 · AlteaSolar water heater · Jun 2023 · Altea10 kW · May 2025 · AlteaSolar water heater · Nov 2022 · AlteaSolar PV · Sep 2021 · Altea10 kW · Jan 2022 · Altea6 kW · Apr 2022 · Altea5 kW · Apr 2023 · Lliber6 kW · Jan 2026 · Altea10 kW · Sep 2022 · AlteaSolar PV · 2022 · AlteaSolar water heater · Aug 2020 · LliberSolar water heater · Jun 2020 · Els Poblets10 kW · Sep 2022 · CalpeSolar water heater · Nov 2019 · CalpeSolar water heater · Oct 2020 · Castellon De La Plana4 kW · Feb 2026 · Pedreguer20 kW · Jun 2025 · Calpe6 kW · Mar 2022 · CalpeSolar water heater · Jun 2021 · Calpe6 kW · 2022 · CalpeSolar water heater · Mar 2024 · CalpeSolar PV · Jul 2020 · CalpeSolar water heater · Jul 2020 · Calpe6 kW · Jan 2024 · Pedreguer2 kW · Jun 2026 · Calpe4 kW · Jun 2025 · CalpeSolar water heater · Nov 2023 · CalpeSolar water heater · Sep 2020 · Benissa6 kW · Mar 2025 · Calpe2 kW · Dec 2020 · Calpe6 kW · Apr 2026 · CalpeSolar water heater · Apr 2022 · Gata De Gorgos10 kW · Jan 2023 · Calpe6 kW · Dec 2024 · Calpe5 kW · May 2023 · Benissa6 kW · Aug 2025 · Calpe5 kW · Oct 2022 · CalpeSolar water heater · Aug 2021 · Altea6 kW · Jan 2026 · BenissaSolar water heater · Aug 2022 · Teulada10 kW · Apr 2022 · BenissaSolar water heater · Jan 2022 · DéniaSolar water heater · Jan 2023 · TeuladaSolar water heater · Feb 2021 · TeuladaSolar water heater · Jun 2020 · Dénia6 kW · Mar 2026 · Teulada3 kW · Mar 2025 · Teulada6 kW · Jun 2025 · TeuladaSolar water heater · Jan 2024 · TeuladaSolar water heater · May 2023 · Teulada6 kW · Oct 2025 · Teulada6 kW · Dec 2023 · DéniaSolar water heater · Aug 2023 · Dénia4 kW · May 2025 · Oropesa Del Mar6 kW · Sep 2020 · Teulada1 kW · Aug 2023 · El Poble Nou De BenitatxellSolar PV · Dec 2020 · JáveaSolar water heater · Dec 2025 · TeuladaSolar water heater · Oct 2021 · Jávea3 kW · Aug 2023 · Jávea6 kW · Jun 2023 · Jávea6 kW · Jan 2025 · Jávea3 kW · Jul 2024 · Alcala De Xivert6 kW · Oct 2025 · Peniscola4 kW · Jul 2026 · PeniscolaSolar water heater · May 2021 · LalbiSolar water heater · Dec 2020 · Mont Roig Del Camp6 kW · Jun 2024 · Reus5 kW · Apr 2024 · Salou8 kW · Mar 2022 · El Vendrell6 kW · 2022 · El Vendrell6 kW · Jul 2024 · El Vendrell6 kW · May 2022 · El Vendrell6 kW · Dec 2022 · El VendrellSolar water heater · Aug 2024 · Calafell4 kW · Oct 2023 · Calafell5 kW · May 2023 · CanyellesSolar PV · Apr 2022 · Canyelles28 kW · Dec 2021 · Sant Pere De Ribes7 kW · Jun 2021 · Sant Pere De RibesSolar water heater · May 2026 · Olivella6 kW · Jun 2023 · Sitges3 kW · Oct 2022 · Sitges6 kW · Jun 2025 · Sitges4 kW · Apr 2025 · Santpedor10 kW · Apr 2026 · Esplugues De LlobregatSolar water heater · Mar 2022 · BarcelonaSolar water heater · 2020 · Barcelona6 kW · Oct 2020 · Barcelona4 kW · May 2023 · Santa Eulalia De Roncana6 kW · Mar 2026 · Alella3 kW · Oct 2024 · Mataro11 kW · Sep 2025 · Mataro10 kW · Jul 2025 · Sant Andreu De Llavaneres6 kW · Aug 2022 · Sant Hilari Sacalm6 kW · Aug 2023 · Sant Vicenc De Montalt6 kW · Nov 2021 · Sant Cebria De VallaltaSolar water heater · Nov 2024 · Lloret de MarSolar water heater · May 2020 · GironaSolar water heater · Sep 2020 · Lloret de Mar6 kW · Jun 2025 · Lloret de Mar5 kW · Aug 2022 · Lloret de Mar3 kW · date unknown · Llagostera3 kW · date unknown · Llagostera3 kW · Nov 2022 · Figueres6 kW · May 2023 · Santa Cristina Daro4 kW · May 2022 · Peralada20 kW · Jan 2025 · Castell Platja Daro6 kW · Aug 2023 · Castell Platja Daro5 kW · Oct 2025 · Calonge4 kW · Nov 2022 · Castello Dempuries2 kW · Jul 2022 · Palamos4 kW · Aug 2022 · Begur3 kW · Nov 2024 · BegurSolar water heater · Aug 2020 · Begur

Dot locations are approximate and are never a customer address: we protect our clients' privacy. System size and date are real.

Installations we've delivered in Jávea

Real installations, anonymised. The annual figure is modelled from the installed system size at the local solar yield — never a customer’s private bill.

What usually stops people — answered

Will anything be in a language I don't read?

No. We work in English, Spanish, German, Dutch, French, Russian, Ukrainian and Polish. The quote, the contract, the warranty and the handover walkthrough are in your language, and so is the person who answers when you write.

Ask us on WhatsApp
Who deals with the trámites and the town hall?

We do. The technical memoria, the ayuntamiento declaration, the electrical certificate, the registration with the distributor and the switch to a self-consumption contract are all inside the turnkey price. You sign; we file.

Ask us on WhatsApp
What if something breaks after you've been paid?

Tier-1 panels and inverters with manufacturer warranties, installed by our own crews rather than subcontractors, plus a workmanship warranty on the installation itself — the exact terms are printed on every kit page and repeated in your quote. Remote monitoring usually shows us a fault before you notice it.

See my roof and my numbers
I'm not in Jávea all year — is it still worth it?

Yes, and it needs nobody at home. Everything the panels produce while the house is empty goes to the grid and is credited on your bill under compensación de excedentes, and you can watch production in the monitoring app from anywhere. We can also size the system around the months you are actually here.

See my roof and my numbers
I live in an apartment — do I need the comunidad to agree?

On a shared roof, yes — and that approval is yours to obtain, not something we can promise on your behalf. Spanish law (LPH art. 17.1) lets a comunidad approve solar with a one-third majority instead of unanimity, and we prepare the technical description and documents you put to the junta. ENERA does the installation itself and files everything with the town hall — the licencia or declaración responsable. If you would like us alongside you at the meeting, or to help submit the request, that is often possible and is sometimes included in the price of the system: write to us and we will agree how to handle it. On your own roof or private terrace you decide alone, and a shared installation can be split between several flats.

See my roof and my numbers

Why homeowners in Jávea choose ENERA

5 installations in Jávea · 4.6★ over 116 Google reviews · installing in Spain since 2013

  • 5 roofs done in Jávea

    Real, delivered systems — every one of them is a dot on the map on this page, not a stock photo of somebody else’s roof.

    See them on the map
  • We speak your language — all eight

    We work in English, Spanish, German, Dutch, French, Russian, Ukrainian and Polish. The quote, the contract, the warranty and the handover walkthrough are in your language, and so is the person who answers when you write.

  • Our own crews, out of Altea

    The people who put the panels on your roof in Jávea are ENERA employees driving out from our own base in Altea. We do not hand the job to a subcontractor and disappear.

  • We do the trámites

    Memoria técnica, the declaración responsable at the Ayuntamiento de Jávea, the electrical certificate and the registration with i-DE, the distributor for this area — filed by ENERA, in your name.

  • Fixed turnkey price from 5300 €, VAT included

    One itemised figure before anyone climbs on the roof: panels, inverter, mounting, installation, legalisation and the contract change. No day rates, no “extras” at the end.

  • A warranty with a company behind it

    Manufacturer warranties on the equipment plus ENERA’s own workmanship warranty on the installation, backed by IBERSUNWIND, S.L., CIF B54715099 — trading since 2013.

See what your roof in Jávea produces — free, no call.

Subsidies, IBI and ICIO in Jávea

Checked August 2026

Municipal property tax (IBI)
25% off, capped at 200 EUR per year · for 3 tax years
Official source
Municipal building tax (ICIO)
95% off · applies only to the solar part of the works budget
Official source
Regional income-tax deduction
40% off, capped at 8,800 EUR per dwelling per year
Official source
National income-tax deduction
20–60% depending on the works, capped
Official source

Conditions change and municipal funds run out — check the official source, or we confirm exactly what applies to your property in your quote.

We file the bonificación and the trámites for you — see what you qualify for

Is solar worth it in Jávea?

Jávea is one of Spain's most established permanent expat communities — owner-occupiers with pools running year-round and electricity bills to match. With 2,047 kWh/m²/yr of solar irradiation and a system yield of 1,622 kWh/kWp/yr, it is also one of Europe's strongest residential solar locations. A typical villa installation pays for itself in around 3.8–5.3 years, then delivers over a decade of near-free electricity.

Solar in Jávea at a glance
MetricJávea
Solar irradiation2,047 kWh/m²
Yield per kWp1,622 kWh/kWp
Optimal tilt35°
Typical system size6–10 kWp
Foreign residents46.8% (Spain ≈13%)
Population30,642
Typical payback≈3.8–5.3 years

Sources: PVGIS (EU JRC), INE. Figures are estimates. Data reviewed June 2026.

Why Jávea is ideal for solar

Jávea (Xàbia) is a town built around villas. From the hillside streets of El Tosalet and Cap Martí to the beachside plots of El Arenal and the clifftop homes above Balcón al Mar, the landscape is dominated by detached houses with generous, south-facing roofs — exactly the profile that makes solar installation straightforward and productive. Unlike high-rise coastal resorts, almost every property here has adequate unshaded roof space to support a meaningful system.

What makes Jávea especially compelling is who lives here. With 46.8% foreign residents — a figure far above the Spanish national average of around 13% — this is one of Spain's most established permanent expat communities, drawing long-term residents from the UK, Germany, the Netherlands, and Scandinavia. These are owner-occupiers in La Villa, El Puerto, and Portichol who heat pools, run air conditioning year-round, and face real, recurring electricity bills. Reducing those bills permanently — rather than simply adding a holiday asset — is the clear motivation, and solar delivers precisely that.

What does solar cost in Jávea?

Jávea's landscape is villa-dominated — hillside properties in El Tosalet and Cap Martí typically need scaffolding and more labour-intensive mounting on pitched tile roofs, and systems of 6–10 kW are common given roof size. Beachside plots in El Arenal tend to be more straightforward. In all cases, grid registration runs through i-DE (the Iberdrola-group distributor operating the grid across Alicante province and the Valencian Community).

A fully installed system in Jávea typically comes in between €5,300 and €8,300 for a 6–10 kW system — including panels, inverter, cabling, mounting hardware, installation labour, and all administrative paperwork: permits with the municipality and grid-registration with i-DE. Larger villa installations with battery storage sit toward or above the top of that range. The exact figure depends on roof size, orientation, panel count, and whether you add a battery. All quotes are provided in writing, in English, Spanish, German, Dutch, French, or Russian.

Tax incentives and grants for solar in Jávea

The most concrete differentiator for permanent residents in Jávea is the Valencian Community IRPF income-tax deduction: up to approximately 40% of the installation cost can be claimed on a main residence through your annual Spanish tax return. If you are tax-resident in Spain, ask your gestor to confirm eligibility before installation.

At the municipal level, the Ayuntamiento de Jávea may offer IBI property-tax and ICIO construction-tax bonuses for solar installations — these vary over time, so confirm what is currently in force. Nationally, a reduced IVA rate applies to solar panel supply and installation, and Next Generation EU self-consumption funds have historically been channelled through the Valencian regional government. Exact amounts depend on your income, municipality, and which funding rounds are open — incentives vary by individual circumstances and ENERA can advise on current options when you request a quote.

How much can you save in Jávea?

At the current Spanish household electricity price of 0.19 €/kWh and a system yield of 1,622 kWh/kWp/yr, a typical villa installation in Jávea can save an estimated €1,210–1,730 per year on electricity bills. That figure is an estimate based on average self-consumption patterns and varies with your actual usage, tariff structure, and system size.

Spain's net-billing scheme — compensación de excedentes — means any surplus electricity your panels export during the day offsets further charges on your bill, maximising the value of every kWh generated. Homes in Jávea with pools and year-round air conditioning — common across El Tosalet, Balcón al Mar, and Cap Martí — typically consume more electricity than seasonal holiday properties, which means more of the solar output is self-consumed at full retail value rather than exported at a lower compensation rate. The combination of high irradiation, year-round occupancy, and real household loads makes the savings estimate robust for this community.

How the process works in Jávea

Installing solar in Jávea follows a clear sequence managed end to end, in your language, from first contact to grid connection.

First, a remote assessment uses your electricity bills and satellite roof imagery — no site visit needed for an initial quote. Once you approve the proposal, a surveyor visits to confirm roof structure, orientation, and shading. Paperwork then runs in parallel: a building permit from the Ayuntamiento de Jávea and a grid-registration application to i-DE (the Iberdrola-group distributor responsible for the Alicante province and Valencian Community grid).

Physical installation on a standard villa roof takes approximately one day. The permits and grid-registration process typically takes a few weeks alongside that — the administrative timeline is the longer element, not the physical work. Once the connection is approved, your system is registered under Spain's net-billing scheme automatically.

For international residents the requirement is a Spanish NIE and proof of property ownership. ENERA works in English, Spanish, German, Dutch, French, and Russian, so no step requires navigating Spanish bureaucracy alone. A battery can be included at installation or retrofitted later.

Solar in Jávea: your questions

How much does a solar installation cost in Jávea?

A fully installed 6–10 kW residential solar system in Jávea (Xàbia) typically costs between €5,300 and €8,300. That price covers panels, inverter, mounting, installation labour, the Jávea (Xàbia) municipal permit, and grid-registration paperwork. The precise cost depends on roof size, system capacity, and whether you include a battery. ENERA provides written quotes in English and other languages at no charge.

See it for your roof
How much can I save on electricity with solar in Jávea?

Based on Jávea's solar resource and the current electricity price of 0.19 €/kWh, a typical villa installation saves an estimated €1,210–1,730 per year. That is an estimate; your actual savings depend on system size, household consumption, and your tariff. Year-round residents with pools or air conditioning in areas like El Tosalet or Cap Martí tend to self-consume more solar output, which increases savings compared with seasonal users.

Can foreigners and non-residents install solar in Jávea?

Yes. Non-residents and foreign nationals can install solar on a property they own in Jávea (Xàbia). The main requirements are a Spanish NIE (foreigner identification number) and proof of property ownership. ENERA handles the full permit and grid-registration process and works in English, German, Dutch, French, Spanish, and Russian, making the process accessible for the large international community — around 46.8% of Jávea's residents — without needing to navigate Spanish bureaucracy alone.

What permits are needed for solar in Jávea, and how long do they take?

You need a minor building permit from the Jávea (Xàbia) town hall and a grid-connection registration with the local distribution network operator. ENERA manages both in parallel with the installation. Physical installation on a villa roof takes approximately one day; the administrative process typically takes a few weeks. The exact timeline depends on the municipality's current workload. ENERA handles all paperwork on your behalf.

How much sun does Jávea get — is the solar yield good?

Jávea (Xàbia) receives 2,047 kWh/m²/yr of solar irradiation according to PVGIS — among the highest figures in Europe. At the optimal tilt of 35° a system generates an estimated 1,622 kWh per kWp installed per year. Positioned between Cap de Sant Antoni and Cap de la Nau on the Costa Blanca, the town benefits from a sheltered microclimate with very high sunshine hours throughout the year, making it an excellent location for solar PV.

Do I need a battery for solar in Jávea?

No, a battery is not required. Panels alone deliver meaningful savings through Spain's net-billing scheme, which compensates you for surplus electricity exported to the grid. A battery becomes worthwhile if you want greater energy independence or to store daytime solar generation for evening use — common for year-round residents in Jávea with high evening electricity demand. Batteries can be added at installation or retrofitted later as your needs change.

Rated 4.6★ across 116 Google reviews · ENERA has installed solar across Spain since 2013

Ready to go solar in Jávea?

Get a free roof analysis for your home in Jávea and see exactly what you could save with solar.