Solar panels in Fuengirola — turnkey installation

4.6★ · 116 Google reviews · 581 installations · since 2013 · 8 languages

Turnkey from 3700 € — a typical 4 kWp system in Fuengirola pays for itself in 3.8–5.3 years.

The price includes panels, inverter, mounting, installation, town-hall legalisation and the switch to a self-consumption contract. VAT included.

Our own crews, Tier-1 components, and we handle the paperwork end to end.

We measure your roof on satellite imagery and show your production, savings and price. No call needed.

Or start from your electricity bill
or
Ask us on WhatsApp

Fuengirola gets 2,141 kWh/m² of sun every year — one of Europe's highest irradiation figures. With 38.1% of residents from abroad living here full-time, ENERA's multilingual team makes going solar straightforward from quote to grid connection.

2141

Solar irradiation · kWh/m²

780 €1120 €

Avg savings / year

≈3.8–5.3 years

Typical payback

The average household in Andalucía spends 909 €/yr on electricity (INE, 2025). That reflects local consumption — climate, dwelling size, appliance mix — not a different price per kWh.

Build custom system
Solar PVSolar water heater

No installations here yet — 5 are already running in Marbella

No installations here yet — 5 are already running in Marbella
Solar water heater · date unknown · A CorunaSolar water heater · May 2022 · LugoSolar water heater · Sep 2020 · CadizSolar water heater · Jun 2020 · CadizSolar water heater · Apr 2022 · CadizSolar water heater · Jul 2020 · El RonquilloSolar PV · Aug 2022 · Mieres6 kW · Oct 2023 · Estepona6 kW · Oct 2022 · Cremenes6 kW · Jun 2021 · Benahavís10 kW · Jun 2024 · Estepona4 kW · May 2026 · Estepona6 kW · Apr 2022 · Benahavís8 kW · Nov 2022 · Benahavís15 kW · Sep 2025 · MarbellaSolar PV · Aug 2022 · Marbella20 kW · Mar 2026 · MarbellaSolar PV · Apr 2022 · Marbella15 kW · May 2026 · MarbellaSolar water heater · Aug 2023 · Alora10 kW · May 2023 · Mijas10 kW · Aug 2023 · Alhaurin El GrandeSolar water heater · Feb 2022 · CamalenoSolar water heater · Dec 2021 · MalagaSolar water heater · Jun 2020 · Malaga6 kW · Nov 2022 · San Martin De Valdeiglesias5 kW · Jun 2023 · MaruganSolar water heater · Jun 2021 · Periana5 kW · 2024 · MarmolejoSolar water heater · Apr 2024 · SedellaSolar water heater · 2021 · Martos4 kW · Feb 2026 · MontefrioSolar water heater · Sep 2021 · NerjaSolar water heater · Jun 2020 · Illescas30 kW · Jun 2025 · Pozuelo De AlarconSolar water heater · Apr 2021 · AlmunecarSolar water heater · Oct 2020 · GranadaSolar water heater · Jul 2021 · GranadaSolar water heater · 2020 · Granada15 kW · Apr 2025 · Bareyo6 kW · Dec 2023 · MonachilSolar water heater · Jun 2022 · Monachil4 kW · Feb 2025 · Cenes De La Vega6 kW · Jul 2023 · Cenes De La VegaSolar water heater · Aug 2023 · LanjaronSolar water heater · Oct 2020 · LanjaronSolar water heater · Nov 2021 · CarataunasSolar PV · Sep 2020 · GuadalajaraSolar water heater · date unknown · AlmeriaSolar water heater · Oct 2023 · AlmeriaSolar water heater · Jul 2020 · AlboxSolar water heater · Oct 2020 · ZurgenaSolar water heater · 2020 · ZurgenaSolar water heater · Apr 2024 · LorcaSolar water heater · Jan 2022 · Lorca5 kW · Sep 2022 · PulpiSolar water heater · Feb 2021 · Calasparra5 kW · Feb 2025 · Lorca3 kW · Sep 2025 · Alhama De Murcia15 kW · Feb 2022 · Mazarrón8 kW · Feb 2025 · MazarrónSolar water heater · Nov 2020 · Mazarrón5 kW · Oct 2025 · Mazarrón3 kW · Jun 2025 · MazarrónSolar water heater · Nov 2020 · FortunaSolar water heater · Apr 2023 · MurciaSolar water heater · Mar 2021 · MurciaSolar water heater · Aug 2023 · MurciaSolar PV · Mar 2021 · Yecla3 kW · Aug 2024 · MurciaSolar water heater · Nov 2022 · MurciaSolar PV · Oct 2023 · MurciaSolar water heater · Oct 2023 · Murcia4 kW · May 2023 · Murcia5 kW · May 2023 · Murcia5 kW · Feb 2025 · PinosoSolar water heater · Jun 2024 · PinosoSolar water heater · Nov 2020 · Pinoso3 kW · Dec 2024 · PinosoSolar water heater · Jan 2023 · PinosoSolar water heater · Jan 2023 · PinosoSolar water heater · Jan 2021 · PinosoSolar water heater · May 2022 · Pinoso6 kW · Apr 2025 · AbanillaSolar water heater · Jun 2020 · Cartagena4 kW · Jul 2022 · Cartagena10 kW · Jan 2024 · PinosoSolar water heater · Apr 2024 · Orihuela10 kW · 2024 · Hondon De Los FrailesSolar water heater · Jun 2020 · OrihuelaSolar water heater · Sep 2020 · OrihuelaSolar PV · Jan 2023 · Orihuela3 kW · Feb 2025 · Hondon De Los FrailesSolar PV · Oct 2022 · OrihuelaSolar water heater · date unknown · Siete AguasSolar water heater · Apr 2021 · Orihuela2 kW · 2020 · OrihuelaSolar water heater · Sep 2024 · La RomanaSolar water heater · Feb 2026 · La RomanaSolar water heater · Apr 2024 · La Romana4 kW · 2021 · ZaragozaSolar water heater · Jan 2024 · Hondon De Las Nieves4 kW · May 2026 · Pilar De La Horadada6 kW · Apr 2025 · Hondon De Las Nieves4 kW · May 2026 · Pilar De La Horadada6 kW · Jun 2026 · Pilar De La Horadada3 kW · Jun 2026 · Pilar De La Horadada6 kW · Sep 2025 · Pilar De La HoradadaSolar water heater · Sep 2025 · La Romana4 kW · Feb 2026 · Pilar De La Horadada4 kW · Jul 2025 · Los Alcázares10 kW · Apr 2025 · Cartagena6 kW · Sep 2025 · Los Alcázares5 kW · May 2026 · JacarillaSolar water heater · Oct 2020 · MonoverSolar water heater · 2021 · San Miguel De SalinasSolar water heater · Apr 2026 · Catral6 kW · Jan 2022 · Orihuela Costa6 kW · Apr 2026 · Pilar De La HoradadaSolar water heater · Jun 2021 · Torrevieja5 kW · Mar 2025 · OrihuelaSolar water heater · May 2023 · CrevillentSolar water heater · Jul 2022 · SaxSolar water heater · Jan 2023 · San Pedro Del PinatarSolar water heater · Feb 2021 · San Miguel De SalinasSolar water heater · Oct 2023 · San Miguel De Salinas6 kW · Apr 2025 · CrevillentSolar PV · May 2021 · Orihuela4 kW · Oct 2022 · Orihuela CostaSolar water heater · Apr 2026 · Orihuela4 kW · Feb 2022 · Orihuela6 kW · Dec 2023 · OrihuelaSolar water heater · Jan 2025 · AspeSolar water heater · Nov 2020 · AspeSolar water heater · Aug 2022 · Pilar De La HoradadaSolar water heater · Feb 2024 · Orihuela Costa3 kW · Dec 2022 · OrihuelaSolar water heater · May 2025 · OrihuelaSolar water heater · 2020 · OrihuelaSolar water heater · Sep 2020 · Orihuela CostaSolar water heater · Jul 2021 · Casinos3 kW · Nov 2022 · Orihuela Costa4 kW · Sep 2025 · Orihuela Costa4 kW · Feb 2026 · Orihuela CostaSolar water heater · Jun 2022 · Orihuela4 kW · Dec 2021 · Orihuela Costa5 kW · Oct 2022 · Orihuela Costa23 kW · Sep 2025 · OrihuelaSolar water heater · 2021 · Orihuela CostaSolar water heater · 2020 · Orihuela CostaSolar water heater · Feb 2026 · Orihuela3 kW · Apr 2026 · Orihuela Costa4 kW · Sep 2022 · Algorfa6 kW · Mar 2025 · Orihuela3 kW · Jun 2026 · Torrevieja6 kW · Dec 2024 · Torrevieja6 kW · Apr 2022 · OrihuelaSolar water heater · Mar 2022 · Daya Vieja4 kW · May 2025 · Los Montesinos6 kW · Apr 2025 · Torrevieja6 kW · Aug 2021 · Orihuela5 kW · Dec 2024 · Benijofar5 kW · Jul 2022 · Orihuela Costa6 kW · Apr 2022 · Orihuela5 kW · Jan 2021 · Orihuela3 kW · Apr 2025 · Orihuela Costa4 kW · Apr 2023 · Rojales6 kW · Apr 2022 · Orihuela Costa10 kW · Feb 2022 · Torrevieja4 kW · Dec 2022 · RojalesSolar PV · Jan 2022 · Rojales4 kW · Jul 2023 · TorreviejaSolar water heater · Oct 2022 · TorreviejaSolar water heater · Apr 2022 · Torrevieja10 kW · Apr 2022 · Rojales4 kW · Jul 2025 · Rojales9 kW · Feb 2024 · Rojales8 kW · May 2025 · TorreviejaSolar water heater · Feb 2026 · Torrevieja6 kW · Jul 2022 · Torrevieja3 kW · Mar 2026 · RojalesSolar water heater · 2024 · San Fulgencio6 kW · Aug 2022 · RojalesSolar water heater · Jan 2021 · Torrevieja5 kW · Jan 2026 · Torrevieja3 kW · Oct 2024 · Torrevieja4 kW · May 2026 · RojalesSolar water heater · Sep 2020 · Rojales5 kW · Nov 2025 · TorreviejaSolar water heater · Dec 2020 · ElcheSolar water heater · Sep 2020 · Torrevieja6 kW · Mar 2022 · Rojales4 kW · Aug 2022 · TorreviejaSolar PV · 2021 · Torrevieja6 kW · Mar 2022 · RojalesSolar water heater · 2019 · Elche6 kW · Oct 2021 · Rojales4 kW · Jan 2023 · TorreviejaSolar water heater · Oct 2023 · Elche3 kW · Dec 2021 · TorreviejaSolar water heater · Mar 2021 · Alcublas5 kW · Sep 2025 · San Fulgencio8 kW · Oct 2022 · Guardamar del Segura5 kW · Jun 2026 · Torrevieja7 kW · Feb 2024 · TorreviejaSolar water heater · Aug 2021 · TorreviejaSolar water heater · Jul 2020 · Torrevieja10 kW · Dec 2023 · TorreviejaSolar water heater · Jul 2020 · TorreviejaSolar water heater · May 2024 · Torrevieja5 kW · 2020 · TorreviejaSolar water heater · 2019 · TorreviejaSolar water heater · Oct 2020 · Torrevieja5 kW · Feb 2023 · San FulgencioSolar water heater · Jul 2021 · Torrevieja3 kW · Aug 2024 · San Fulgencio3 kW · Dec 2024 · Torrevieja4 kW · Aug 2022 · Guardamar del Segura6 kW · Aug 2025 · Cheste5 kW · Dec 2024 · TorreviejaSolar water heater · Sep 2021 · Torrevieja4 kW · Jun 2026 · TorreviejaSolar water heater · Feb 2021 · Torrevieja8 kW · May 2023 · San Fulgencio6 kW · Dec 2023 · Torrevieja5 kW · Mar 2026 · TorreviejaSolar water heater · Jun 2020 · Castalla3 kW · Sep 2022 · Torrevieja3 kW · Oct 2022 · Torrevieja6 kW · Jul 2024 · Torrevieja6 kW · Oct 2022 · Torrevieja5 kW · Jun 2025 · Guardamar del Segura6 kW · Jan 2024 · Guardamar del Segura2 kW · Jan 2025 · Torrevieja6 kW · May 2025 · TorreviejaSolar water heater · 2019 · Torrevieja6 kW · Feb 2026 · TorreviejaSolar water heater · Jan 2024 · Torrevieja4 kW · Feb 2021 · Guardamar del SeguraSolar water heater · Jan 2023 · LliriaSolar water heater · Sep 2020 · Elche5 kW · Feb 2025 · Castalla6 kW · Jan 2023 · Godelleta6 kW · Aug 2022 · Montserrat6 kW · Jun 2021 · Montserrat4 kW · Jul 2026 · Turis3 kW · Sep 2025 · TibiSolar water heater · May 2022 · LliriaSolar water heater · Mar 2022 · Alicante4 kW · Apr 2026 · AlbericSolar water heater · Feb 2022 · Santa Pola5 kW · Jan 2022 · Santa PolaSolar water heater · May 2021 · Santa PolaSolar water heater · Aug 2020 · Santa Pola10 kW · Aug 2025 · Santa PolaSolar water heater · Nov 2022 · Agullent4 kW · Aug 2022 · Santa Pola4 kW · Mar 2023 · Mutxamel6 kW · Jun 2023 · ManisesSolar water heater · Dec 2023 · Santa PolaSolar water heater · May 2023 · AlicanteSolar water heater · May 2022 · Xativa6 kW · Jan 2025 · Xativa5 kW · Sep 2023 · Alicante10 kW · Mar 2026 · AlicanteSolar water heater · date unknown · AlicanteSolar water heater · May 2023 · AlicanteSolar PV · Aug 2021 · AlicanteSolar water heater · May 2021 · Alicante3 kW · Feb 2025 · Alicante6 kW · Jun 2024 · Alicante10 kW · Nov 2022 · Alicante4 kW · Sep 2024 · XixonaSolar water heater · Dec 2021 · Alicante6 kW · Apr 2022 · PaternaSolar water heater · Apr 2024 · AlcoiSolar water heater · Sep 2023 · Alicante5 kW · Jun 2025 · AlicanteSolar water heater · Mar 2025 · Alicante10 kW · Jan 2023 · Mutxamel10 kW · Feb 2025 · Godella3 kW · Aug 2023 · MutxamelSolar water heater · Jul 2021 · Alzira3 kW · Aug 2023 · Mutxamel6 kW · Jan 2024 · Sant Joan Dalacant6 kW · Jul 2022 · MutxamelSolar water heater · Feb 2021 · Alicante3 kW · Sep 2023 · Mutxamel7 kW · Nov 2025 · Alicante3 kW · Nov 2025 · Busot3 kW · Aug 2023 · MutxamelSolar water heater · Aug 2023 · Mutxamel5 kW · Nov 2021 · Alicante5 kW · Jan 2025 · Busot4 kW · Sep 2024 · Busot6 kW · Oct 2025 · MutxamelSolar water heater · 2021 · Albal4 kW · Dec 2023 · Busot6 kW · Mar 2024 · AlicanteSolar water heater · May 2022 · El CampelloSolar water heater · Aug 2022 · GodellaSolar water heater · Aug 2022 · El CampelloSolar water heater · May 2021 · El CampelloSolar PV · Jan 2021 · El CampelloSolar PV · Jan 2021 · El CampelloSolar water heater · Nov 2022 · El CampelloSolar water heater · Oct 2020 · El CampelloSolar water heater · Oct 2020 · MillenaSolar water heater · Oct 2020 · El CampelloSolar PV · Jan 2023 · Alzira3 kW · Mar 2026 · ValenciaSolar water heater · Nov 2021 · El Campello5 kW · Sep 2023 · ValenciaSolar water heater · Jun 2020 · ValenciaSolar water heater · Dec 2020 · Valencia5 kW · Jan 2023 · AlziraSolar water heater · Feb 2021 · AlboraiaSolar water heater · Sep 2020 · AlmudainaSolar water heater · Jan 2021 · Relleu10 kW · Jun 2026 · Relleu3 kW · Apr 2025 · Rafelbunyol5 kW · Dec 2024 · SuecaSolar water heater · Jan 2022 · Relleu10 kW · Jul 2022 · El Campello4 kW · Sep 2021 · El Campello6 kW · Jun 2025 · Sueca5 kW · Sep 2025 · SuecaSolar water heater · Jan 2021 · Relleu6 kW · May 2026 · La Vila Joiosa5 kW · Mar 2025 · Llocnou De Sant Jeroni2 kW · Jul 2024 · SaguntoSolar water heater · Mar 2025 · Orxeta5 kW · Jan 2026 · Orxeta14 kW · Jun 2025 · La Vila JoiosaSolar water heater · Aug 2021 · CulleraSolar water heater · 2019 · OrxetaSolar water heater · Apr 2026 · Cullera6 kW · Oct 2024 · GandiaSolar PV · Jun 2022 · Finestrat3 kW · Nov 2024 · Finestrat6 kW · Dec 2025 · FinestratSolar water heater · Nov 2022 · FinestratSolar water heater · date unknown · Finestrat6 kW · Jul 2025 · AlteaSolar water heater · Feb 2022 · Finestrat3 kW · Jul 2024 · Finestrat6 kW · Oct 2023 · FinestratSolar water heater · Dec 2024 · Finestrat6 kW · May 2024 · Finestrat5 kW · Jul 2022 · FinestratSolar water heater · Dec 2022 · FinestratSolar water heater · Oct 2020 · El Castell De GuadalestSolar water heater · May 2024 · Finestrat6 kW · Mar 2021 · Finestrat6 kW · Aug 2025 · Finestrat4 kW · Aug 2022 · Finestrat6 kW · Sep 2022 · Finestrat3 kW · Oct 2023 · Finestrat4 kW · Jul 2021 · SaguntoSolar water heater · Jun 2024 · Finestrat6 kW · Oct 2022 · Finestrat3 kW · Jan 2023 · Finestrat6 kW · Oct 2023 · Finestrat5 kW · Apr 2022 · Finestrat6 kW · Aug 2025 · Finestrat4 kW · Nov 2020 · FinestratSolar water heater · Sep 2025 · Finestrat6 kW · Jul 2022 · Finestrat10 kW · Jan 2023 · Finestrat6 kW · Feb 2022 · Finestrat6 kW · Jun 2026 · FinestratSolar water heater · Jan 2021 · Finestrat6 kW · Jan 2023 · Finestrat4 kW · Jan 2026 · Finestrat8 kW · Jan 2023 · Finestrat6 kW · Aug 2023 · Finestrat3 kW · Aug 2025 · Finestrat6 kW · Nov 2022 · Finestrat5 kW · Nov 2022 · FinestratSolar water heater · May 2022 · Gandia10 kW · Dec 2022 · Finestrat6 kW · Jun 2022 · Finestrat6 kW · May 2025 · FinestratSolar water heater · Nov 2021 · Finestrat6 kW · Feb 2025 · FinestratSolar water heater · Feb 2022 · El Castell De GuadalestSolar water heater · Feb 2021 · Callosa Den Sarria6 kW · May 2023 · Polop3 kW · Jul 2022 · Polop5 kW · Feb 2024 · BenidormSolar water heater · Feb 2024 · Polop5 kW · Jun 2022 · Polop6 kW · Jan 2023 · BenidormSolar water heater · Aug 2023 · Daimus5 kW · Jul 2026 · Polop6 kW · Oct 2022 · Polop4 kW · Sep 2025 · PolopSolar water heater · Dec 2023 · Benidorm3 kW · Apr 2025 · PolopSolar water heater · Jul 2022 · BenidormSolar water heater · 2021 · La NucíaSolar water heater · Jul 2021 · La NucíaSolar water heater · Oct 2024 · La NucíaSolar water heater · Jun 2020 · La NucíaSolar PV · Apr 2021 · OlivaSolar water heater · Sep 2020 · OlivaSolar water heater · Jun 2021 · OlivaSolar water heater · Jul 2020 · La Nucía6 kW · Sep 2021 · Lalfas Del PiSolar water heater · Oct 2021 · La NucíaSolar water heater · Aug 2022 · OlivaSolar water heater · Sep 2023 · Finestrat10 kW · Sep 2021 · Lalfas Del PiSolar water heater · 2019 · AlteaSolar water heater · Aug 2021 · Lalfas Del PiSolar water heater · Sep 2020 · Lalfas Del Pi10 kW · Sep 2021 · Benidorm4 kW · Apr 2026 · La Nucía10 kW · Apr 2026 · Lalfas Del Pi10 kW · Oct 2025 · Lalfas Del Pi6 kW · Nov 2023 · Lalfas Del PiSolar water heater · Oct 2021 · Lalfas Del Pi8 kW · Sep 2024 · Murla10 kW · Jun 2022 · La Nucía10 kW · Dec 2023 · AlteaSolar PV · Oct 2023 · Lalfas Del Pi10 kW · Feb 2026 · Lalfas Del PiSolar water heater · Aug 2022 · Altea6 kW · Jan 2023 · AlteaSolar PV · Jan 2024 · AlteaSolar water heater · Jun 2024 · Lalfas Del Pi8 kW · May 2025 · AlteaSolar water heater · Aug 2021 · Altea5 kW · May 2026 · Altea10 kW · May 2021 · Oliva4 kW · Sep 2023 · Lalfas Del PiSolar water heater · Jan 2023 · AlteaSolar water heater · May 2021 · AlteaSolar water heater · Jun 2021 · AlteaSolar water heater · Dec 2023 · Dénia6 kW · Aug 2021 · Altea5 kW · Jan 2025 · OlivaSolar water heater · Oct 2021 · Benimeli5 kW · Mar 2021 · Lalfas Del Pi4 kW · Jan 2025 · OlivaSolar water heater · Jul 2020 · Alcalali7 kW · Sep 2022 · AlteaSolar water heater · May 2023 · Altea6 kW · Dec 2023 · Altea10 kW · Aug 2024 · AlteaSolar water heater · Jun 2023 · Altea10 kW · May 2025 · AlteaSolar water heater · Nov 2022 · AlteaSolar PV · Sep 2021 · Altea10 kW · Jan 2022 · Altea6 kW · Apr 2022 · Altea5 kW · Apr 2023 · Lliber6 kW · Jan 2026 · Altea10 kW · Sep 2022 · AlteaSolar PV · 2022 · AlteaSolar water heater · Aug 2020 · LliberSolar water heater · Jun 2020 · Els Poblets10 kW · Sep 2022 · CalpeSolar water heater · Nov 2019 · CalpeSolar water heater · Oct 2020 · Castellon De La Plana4 kW · Feb 2026 · Pedreguer20 kW · Jun 2025 · Calpe6 kW · Mar 2022 · CalpeSolar water heater · Jun 2021 · Calpe6 kW · 2022 · CalpeSolar water heater · Mar 2024 · CalpeSolar PV · Jul 2020 · CalpeSolar water heater · Jul 2020 · Calpe6 kW · Jan 2024 · Pedreguer2 kW · Jun 2026 · Calpe4 kW · Jun 2025 · CalpeSolar water heater · Nov 2023 · CalpeSolar water heater · Sep 2020 · Benissa6 kW · Mar 2025 · Calpe2 kW · Dec 2020 · Calpe6 kW · Apr 2026 · CalpeSolar water heater · Apr 2022 · Gata De Gorgos10 kW · Jan 2023 · Calpe6 kW · Dec 2024 · Calpe5 kW · May 2023 · Benissa6 kW · Aug 2025 · Calpe5 kW · Oct 2022 · CalpeSolar water heater · Aug 2021 · Altea6 kW · Jan 2026 · BenissaSolar water heater · Aug 2022 · Teulada10 kW · Apr 2022 · BenissaSolar water heater · Jan 2022 · DéniaSolar water heater · Jan 2023 · TeuladaSolar water heater · Feb 2021 · TeuladaSolar water heater · Jun 2020 · Dénia6 kW · Mar 2026 · Teulada3 kW · Mar 2025 · Teulada6 kW · Jun 2025 · TeuladaSolar water heater · Jan 2024 · TeuladaSolar water heater · May 2023 · Teulada6 kW · Oct 2025 · Teulada6 kW · Dec 2023 · DéniaSolar water heater · Aug 2023 · Dénia4 kW · May 2025 · Oropesa Del Mar6 kW · Sep 2020 · Teulada1 kW · Aug 2023 · El Poble Nou De BenitatxellSolar PV · Dec 2020 · JáveaSolar water heater · Dec 2025 · TeuladaSolar water heater · Oct 2021 · Jávea3 kW · Aug 2023 · Jávea6 kW · Jun 2023 · Jávea6 kW · Jan 2025 · Jávea3 kW · Jul 2024 · Alcala De Xivert6 kW · Oct 2025 · Peniscola4 kW · Jul 2026 · PeniscolaSolar water heater · May 2021 · LalbiSolar water heater · Dec 2020 · Mont Roig Del Camp6 kW · Jun 2024 · Reus5 kW · Apr 2024 · Salou8 kW · Mar 2022 · El Vendrell6 kW · 2022 · El Vendrell6 kW · Jul 2024 · El Vendrell6 kW · May 2022 · El Vendrell6 kW · Dec 2022 · El VendrellSolar water heater · Aug 2024 · Calafell4 kW · Oct 2023 · Calafell5 kW · May 2023 · CanyellesSolar PV · Apr 2022 · Canyelles28 kW · Dec 2021 · Sant Pere De Ribes7 kW · Jun 2021 · Sant Pere De RibesSolar water heater · May 2026 · Olivella6 kW · Jun 2023 · Sitges3 kW · Oct 2022 · Sitges6 kW · Jun 2025 · Sitges4 kW · Apr 2025 · Santpedor10 kW · Apr 2026 · Esplugues De LlobregatSolar water heater · Mar 2022 · BarcelonaSolar water heater · 2020 · Barcelona6 kW · Oct 2020 · Barcelona4 kW · May 2023 · Santa Eulalia De Roncana6 kW · Mar 2026 · Alella3 kW · Oct 2024 · Mataro11 kW · Sep 2025 · Mataro10 kW · Jul 2025 · Sant Andreu De Llavaneres6 kW · Aug 2022 · Sant Hilari Sacalm6 kW · Aug 2023 · Sant Vicenc De Montalt6 kW · Nov 2021 · Sant Cebria De VallaltaSolar water heater · Nov 2024 · Lloret de MarSolar water heater · May 2020 · GironaSolar water heater · Sep 2020 · Lloret de Mar6 kW · Jun 2025 · Lloret de Mar5 kW · Aug 2022 · Lloret de Mar3 kW · date unknown · Llagostera3 kW · date unknown · Llagostera3 kW · Nov 2022 · Figueres6 kW · May 2023 · Santa Cristina Daro4 kW · May 2022 · Peralada20 kW · Jan 2025 · Castell Platja Daro6 kW · Aug 2023 · Castell Platja Daro5 kW · Oct 2025 · Calonge4 kW · Nov 2022 · Castello Dempuries2 kW · Jul 2022 · Palamos4 kW · Aug 2022 · Begur3 kW · Nov 2024 · BegurSolar water heater · Aug 2020 · Begur

Dot locations are approximate and are never a customer address: we protect our clients' privacy. System size and date are real.

What usually stops people — answered

Will anything be in a language I don't read?

No. We work in English, Spanish, German, Dutch, French, Russian, Ukrainian and Polish. The quote, the contract, the warranty and the handover walkthrough are in your language, and so is the person who answers when you write.

Ask us on WhatsApp
Who deals with the trámites and the town hall?

We do. The technical memoria, the ayuntamiento declaration, the electrical certificate, the registration with the distributor and the switch to a self-consumption contract are all inside the turnkey price. You sign; we file.

Ask us on WhatsApp
What if something breaks after you've been paid?

Tier-1 panels and inverters with manufacturer warranties, installed by our own crews rather than subcontractors, plus a workmanship warranty on the installation itself — the exact terms are printed on every kit page and repeated in your quote. Remote monitoring usually shows us a fault before you notice it.

See my roof and my numbers
I'm not in Fuengirola all year — is it still worth it?

Yes, and it needs nobody at home. Everything the panels produce while the house is empty goes to the grid and is credited on your bill under compensación de excedentes, and you can watch production in the monitoring app from anywhere. We can also size the system around the months you are actually here.

See my roof and my numbers
I live in an apartment — do I need the comunidad to agree?

On a shared roof, yes — and that approval is yours to obtain, not something we can promise on your behalf. Spanish law (LPH art. 17.1) lets a comunidad approve solar with a one-third majority instead of unanimity, and we prepare the technical description and documents you put to the junta. ENERA does the installation itself and files everything with the town hall — the licencia or declaración responsable. If you would like us alongside you at the meeting, or to help submit the request, that is often possible and is sometimes included in the price of the system: write to us and we will agree how to handle it. On your own roof or private terrace you decide alone, and a shared installation can be split between several flats.

See my roof and my numbers

Why homeowners in Fuengirola choose ENERA

4.6★ over 116 Google reviews · installing in Spain since 2013

  • We speak your language — all eight

    We work in English, Spanish, German, Dutch, French, Russian, Ukrainian and Polish. The quote, the contract, the warranty and the handover walkthrough are in your language, and so is the person who answers when you write.

  • Our own crews, out of Altea

    The people who put the panels on your roof in Fuengirola are ENERA employees driving out from our own base in Altea. We do not hand the job to a subcontractor and disappear.

  • We do the trámites

    Memoria técnica, the declaración responsable at the Ayuntamiento de Fuengirola, the electrical certificate and the registration with e-distribución, the distributor for this area — filed by ENERA, in your name.

  • Fixed turnkey price from 3700 €, VAT included

    One itemised figure before anyone climbs on the roof: panels, inverter, mounting, installation, legalisation and the contract change. No day rates, no “extras” at the end.

  • A warranty with a company behind it

    Manufacturer warranties on the equipment plus ENERA’s own workmanship warranty on the installation, backed by IBERSUNWIND, S.L., CIF B54715099 — trading since 2013.

See what your roof in Fuengirola produces — free, no call.

Subsidies, IBI and ICIO in Fuengirola

Checked August 2026

Municipal property tax (IBI)
50% off, capped at 25% of the installation cost per year · for 3 tax years
Official source
Municipal building tax (ICIO)
50% off · existing buildings at least 5 years old
Official source
National income-tax deduction
20–60% depending on the works, capped
Official source

Conditions change and municipal funds run out — check the official source, or we confirm exactly what applies to your property in your quote.

We file the bonificación and the trámites for you — see what you qualify for

Is solar worth it in Fuengirola?

Fuengirola is a dense, year-round international community — one of the highest concentrations of permanent overseas residents on the Costa del Sol — which means your solar system works all twelve months, not just summer. With 2,141 kWh/m² of annual irradiation and an estimated yield of 1,678 kWh per kilowatt-peak, a typical home system pays back in around 3.8–5.3 years while cutting roughly €780–1,120 from the annual electricity bill.

Solar in Fuengirola at a glance
MetricFuengirola
Solar irradiation2,141 kWh/m²
Yield per kWp1,678 kWh/kWp
Optimal tilt33°
Typical system size4–6 kWp
Foreign residents38.1% (Spain ≈13%)
Population85,211
Typical payback≈3.8–5.3 years

Sources: PVGIS (EU JRC), INE. Figures are estimates. Data reviewed June 2026.

Why Fuengirola is a strong fit for solar

Fuengirola is home to roughly 85,211 people, of whom 38.1% are foreign nationals — one of the highest international resident ratios on the Costa del Sol. In neighbourhoods like Los Boliches, Torreblanca, Los Pacos, and Carvajal, the majority of overseas homeowners live here permanently rather than seasonally. That changes the economics entirely: a solar system is measured against a full twelve months of electricity bills, not a summer-holiday slice. Residents who chose Fuengirola for affordable coastal living feel every euro saved on electricity directly. The housing mix — rooftop apartments in the Centro, attached villas in El Higuerón, and urbanization townhouses up towards the hills — covers a range of system types, from individual rooftop arrays to community installations on shared blocks. ENERA is a national specialist that covers the Costa del Sol with its own multilingual team, serving British, Scandinavian, German, and Dutch homeowners in the language they're most comfortable with and handling all local paperwork on their behalf.

What does a solar installation cost in Fuengirola?

The variety in Fuengirola's housing stock directly drives installation costs. Rooftop apartments in the Centro and shared blocks in Los Boliches often involve comunidad considerations and may require a community vote before installation can proceed. Attached villas in El Higuerón and urbanization townhouses up towards the hills typically carry pitched tile roofs with scaffolding requirements; systems of 4–6 kW are common there. By contrast, flatter terrace roofs in Los Pacos and Carvajal suit a simpler ballasted frame setup that keeps labour costs down. Grid connection in Fuengirola is handled by e-distribución (the Endesa-group distributor operating across Málaga province and Andalusia), whose registration fees are factored into any complete quote. Across all these property types, a fully installed 4–6 kW system — panels, inverter, cabling, permits, and grid registration included — typically runs between €3,700 and €5,400. Spain's reduced IVA on solar equipment lowers the upfront figure, and available regional incentives can reduce it further. With electricity priced at around €0.19/kWh, the payback calculation starts from the first day of generation. All figures are estimates; ENERA produces a site-specific proposal after a roof assessment.

Solar grants and tax incentives available in Fuengirola

The most concrete regional support available in Fuengirola is the Agencia Andaluza de la Energía self-consumption grant — a subsidy structured as a payment per kW installed for residential renewable systems and battery storage. Calls open periodically and funds are allocated until exhausted, so applying early in a round matters. One fact competitors often skip: Andalusia currently has no regional IRPF income-tax deduction for solar, so any claim to the contrary should be treated with caution. At the national level, Spain's reduced IVA on solar equipment remains in place and Next Generation EU funds continue to flow through regional programmes. Many municipalities in Málaga province also offer an IBI property-tax bonus for properties with certified renewable installations — eligibility varies by town, so it is worth confirming with the local council or asking ENERA directly. All incentives are subject to available budget, open application rounds, and regulatory change; ENERA tracks active calls and helps clients apply for whatever support is open at the time of installation.

How much can you save on electricity in Fuengirola?

A typical household in Fuengirola can expect to save around €780–1,120 per year on electricity once a well-sized system is running — based on current electricity prices of approximately €0.19/kWh and the local solar yield of 1,678 kWh per kWp per year. That translates to an estimated payback of around 3.8–5.3 years on the installed cost, after which the electricity the panels produce is effectively free for the remaining 15-plus years of panel life. Permanent residents in Torreblanca, Los Pacos, and Carvajal who run air conditioning, heat pumps, or electric water heating through the year see the highest returns because their consumption is spread across all twelve months — precisely the pattern that maximises self-consumption. Spain's net-billing scheme ("compensación de excedentes") also allows you to feed surplus electricity back to the grid in exchange for a credit on your bill, reducing waste from the hours your panels produce more than you use. All savings figures are estimates and depend on actual consumption, system size, and tariff.

How the installation process works in Fuengirola

Going solar in Fuengirola starts with a free assessment of your specific roof — whether that is a terrace apartment in the Centro, an attached villa in El Higuerón, or a townhouse in Los Boliches or Torreblanca — to match system size to your actual consumption and roof orientation. ENERA then delivers a fixed-price proposal covering equipment, installation, and all paperwork, with no hidden extras. Once you confirm, the process splits into two parallel tracks: the municipal building permit is filed with the Ayuntamiento de Fuengirola, while the grid-connection application goes to e-distribución (the Endesa-group distributor for Málaga province and Andalusia). Physical installation of a standard residential system typically takes one day; permits and grid registration usually complete within a few weeks. ENERA handles all subsidy filings on your behalf at the same time. Non-resident homeowners with a Spanish NIE and proof of ownership install on exactly the same basis as residents. After commissioning, the system is registered under Spain's self-consumption regulations so net-billing compensation applies automatically. The entire process is managed in English — or Spanish, German, Dutch, French, or Russian — whichever suits you best.

Solar in Fuengirola: your questions

How much does a solar installation cost in Fuengirola?

A fully installed 4–6 kW system in Fuengirola typically costs between €3,700 and €5,400, including panels, inverter, mounting, and all paperwork. The exact figure depends on your roof type, system size, and whether you add a battery. Reduced IVA on solar equipment applies nationally, and regional or municipal grants can lower the net cost further — though these vary and are subject to available funds. ENERA provides a fixed-price quote after assessment.

See it for your roof
How much will I save on electricity bills in Fuengirola?

A typical household in Fuengirola can save an estimated €780–1,120 per year on electricity, based on current prices of around €0.19/kWh and the local solar yield of 1,678 kWh/kWp/yr. Permanent residents who use air conditioning, heat pumps, or electric water heating year-round tend to see the strongest returns because their consumption is spread across all twelve months. Savings are estimates and depend on actual usage and system size.

Can non-residents or foreign nationals install solar in Fuengirola?

Yes. Non-residents can install solar in Fuengirola on the same basis as Spanish residents, provided they hold a Spanish NIE (tax identification number) and have proof of ownership of the property. ENERA's multilingual team handles this regularly for British, Scandinavian, German, and Dutch homeowners across the Costa del Sol, managing all permit applications and grid registration paperwork in your preferred language. The NIE itself is a standard administrative step for any property owner in Spain.

What permits are required for solar in Fuengirola, and how long do they take?

A residential solar installation in Fuengirola requires a municipal building permit and registration with the electricity distributor for grid connection, plus registration under Spain's self-consumption regulations. Physical installation typically takes one day. Permits and grid registration run in parallel and are usually completed within a few weeks, though exact timelines depend on the municipality and distributor workload. ENERA manages all of this on the homeowner's behalf, so you do not need to deal with Spanish administration directly.

How much sun does Fuengirola get — is it enough for solar to make sense?

Yes, clearly. Fuengirola receives 2,141 kWh/m² of solar irradiation per year according to PVGIS data — among the highest figures in Europe. Every kilowatt-peak of installed panels produces an estimated 1,678 kWh annually, at an optimal tilt of 33 degrees. That level of resource means solar systems in Fuengirola generate substantial energy even in winter, making the economics work across the full year rather than just summer months.

Do I need a battery with my solar installation in Fuengirola?

No, a battery is not required. Most homes in Fuengirola connect to the grid under Spain's net-billing scheme, which credits surplus electricity against your bill — so unused daytime generation is not simply wasted. That said, a battery increases self-consumption, provides backup during outages, and can make sense if your household consumption peaks in the evenings. ENERA will advise based on your actual usage profile. The Andalusian regional grant also covers battery storage when a funding call is open and budget remains, which can improve the economics — we check whether a round is running when we quote.

We also install around Fuengirola

Show all 2 more
Rated 4.6★ across 116 Google reviews · ENERA has installed solar across Spain since 2013

Ready to go solar in Fuengirola?

Get a free roof analysis for your home in Fuengirola and see exactly what you could save with solar.